Estimates And Quotes
Every project is priced with a free on-site estimate. Your quote is based on the size of the space, the condition of the concrete, and the floor system you choose: flake, metallic, or solid color and clear coat. Your signed quote lists the work included and the total price.
Workspace Preparation
Before we arrive to the job site, the customer is responsible for clearing the area of all vehicles, furniture, boxes, and personal items. Rhino Epoxy Flooring is not responsible for moving, assembling, or storing personal property.
Surface Preparation And Repairs
Before every project, we sand and grind the surface so the new coating bonds directly to the concrete. Existing floor coatings are removed as part of this preparation; we do not install over them. Cracks, holes, and other imperfections are repaired or patched where possible. Major cracking, breaks, or holes may not be repairable, and we will let you know during your estimate. We are not liable for future cracks, peeling, or damage caused by circumstances out of our control, including but not limited to: the house settling, foundation shifting, or severe moisture pressure rising from beneath the concrete slab.
Project Timeline
Most projects take about two days to complete. Larger projects can take longer.
Curing Time And Access
After the final high-gloss topcoat is applied, the floor needs at least 24 hours to cure before it can be used, and we recommend waiting a full 48 hours. Rhino Epoxy Flooring is not responsible for any damage, including but not limited to: footprints, pet tracks, tire marks, or debris caused by accidents, individuals, animals, or vehicles entering the workspace before the coating is fully cured.
Floor Care
Your finished floor needs only simple cleaning and regular care. The finish resists water and chemicals as long as the coating is not damaged, cracked, or lifting. If you notice any damage, contact us.
Color And Texture Variations
Because our epoxy and concrete coatings are hand-applied, custom designs, slight variations in flake distribution, texture, and color blending are a natural part of the process and are not considered defects.
Payment Terms
Payment is due in full immediately upon project completion, which is defined as the application of the final topcoat and the complete cleanup of the workspace area.